Explore.
Our.
Projects.
MCCCD – GCC VETERAN SERVICES CENTER
Delivery Process: Construction Manager at Risk
Total Square Footage: 2,500 SF
Full gut and renovation of an existing 1600 SF building on the Glendale Community College campus. Construction of new 2500 SF addition. All new fixtures and finishes. New LED lighting package, new underground plumbing, new mechanical and building controls new electrical service to distribution panel, high efficiency glazing.
Work also included major drainage improvements: added a drywell and several trench drains.
SOLTERRA ASSISTED LIVING DEER VALLEY
Delivery Process: Construction Manager at Risk
Total Square Footage: 95,415 SF
Starbucks – Tucson
Delivery Process: Tenant Improvement
Total Square Footage: 2,042 SF
Renovation of 2,042 SF including a gray space within the existing store. Scope of work included demolition, concrete slab on grade, framing drywall, millwork, glass door systems, plumbing electrical and mechanical, special finishes and FFE furnishing. Timeline was 14 days and was completed on scheduled with zero punch list.
BUILDING 313
Delivery Process: Tenant Improvement
Total Square Footage: 15,602 SF
HELIO BASIN BREWING CO.
Delivery Process: Tenant Improvement
Total Square Footage: 8,400 SF
8400 SF tenant improvement of vacant billiard bar including demolition of the previous space to make room for newly built brew room, mill room, commercial grade kitchen with walk-in cooler and full-service restaurant.
Build out also has a complete upgrade of mechanical, electrical and plumbing systems, plus refacing the front of the building with full glass high-bay panel doors.
CHASE FIELD STADIUM
Delivery Process: Construction Manager at Risk
Awards: 2017 ICRI Project of The Year Award – Special Projects
PROJECT Q – BARNONE
Delivery Process: Construction Manager at Risk
Total Square Footage: 29,130 SF + 28,960 SF
Phase one was a brand new two-story masonry training building for the Chandler Fire and Police Department training programs. Construction of the training building included an auditorium, lobby, elevator, classrooms, fitness room, defensive tactics room, simulation rooms, locker rooms, restrooms, break room, offices, IT spaces, and three training prop buildings. Site work includes site excavation, drainage/retention, paving/parking, lighting, security fencing and gates, landscape and irrigation, wet and dry utility extensions and services (including five dry wells), sidewalks, signage, and roadway modifications for a left turn lane. A pedestrian bridge was constructed over the retention area and a permanent 750KW backup generator installed. Phase II included new construction of a 19,960 SF pre-cast firing range training building with six drive-through apparatus bays and a 19,000 SF pre-engineered metal multi-purpose building. The multi-purpose building features a Fire Department classroom, lockers and showers, equipment storage, and shop spaces for Fire staff and recruits. These two buildings were constructed directly behind the main building built in Phase one.
We’d love to hear about your project