Xavier College Preparatory High School
Delivery Process: Design/Build
Total Square Footage: 5,300 SF
Renovation of an existing locker room including offices, restrooms, showers, concessions. This project required completely gutting the walls, ceilings, floors, & MEP of the existing locker room.
New structural provisions have been installed during this phase for phase 2 addition of the second floor including helical piers, concrete footers, & steel columns. New finishes include custom terrazzo flooring through-out the space, tile wainscoting in the restrooms & wet walls, full height cultured marble walls through-out the shower area. Ceiling are ACT rated for wet locations.
All new lockers installed on cast-in-place concrete benches. MEP includes all new HVAC system connected to the campus chilled water loop. Lighting in the space consists of 2×2 LED drop-in fixtures connected to the campus EMS system.