Projects
New two-story K–8 school with classrooms, labs, offices, and a large gymnasium.
Buckeye, AZ
Great Hearts Arizona
Orcutt Winslow
Education
The project consisted of the construction of a new two-story, 85,256 SF ground-up Great Hearts K–8 charter school campus on 25.05 acres, located on the east side of Jackrabbit Trail at the Blue Horizons Parkway alignment in Buckeye, Arizona. The campus included 54 classrooms and labs, 43 administrative and conference spaces, a 7,700+ SF full-size gymnasium with locker rooms, a multi-purpose room with a warming kitchen, four preschool classrooms, a drama room, a nurse’s station, and two copy rooms. Exterior improvements featured a full-size football/soccer field, outdoor activity areas, surface parking, and site infrastructure, including stormwater systems, paving, lighting, signage, and concrete work.
Education
Renovation of a historic campus building into flexible student collaboration spaces with modern systems and sustainability upgrades.
Education
New classroom and science building with classrooms, faculty offices, labs, lecture halls, and studio spaces.
Education
Renovation of NAU’s LRC Building #61 with updated interiors, MEP upgrades, two new entrances with steel canopies, and exterior improvements including new utilities, brick restoration, and landscaping.